Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance

Citations

WEB OF SCIENCE

52
Citations

SCOPUS

61

초록

This research focuses on the problem of scheduling jobs on a single machine that requires periodic maintenance with the objective of minimizing the number of tardy jobs. We present a two-phase heuristic algorithm in which an initial solution is obtained first with a method modified from Moore's algorithm for the problem without maintenance and then the solution is improved in the second phase. Performance of the proposed heuristic algorithm is evaluated through computational experiments on randomly generated problem instances and results show that the heuristic gives solutions close to those obtained from a commercial integer programming solver in much shorter time and works better than an existing heuristic algorithm in terms of the solution quality. (C) 2011 Elsevier Ltd. All rights reserved.

키워드

SchedulingSingle machinePeriodic maintenanceTardy jobsHeuristicTOTAL COMPLETION-TIMETOOL CHANGESFLOW-TIMEALGORITHM
제목
Minimizing the number of tardy jobs in a single-machine scheduling problem with periodic maintenance
저자
Lee, Ju-YongKim, Yeong-Dae
DOI
10.1016/j.cor.2011.11.002
발행일
2012-09
유형
Article
저널명
Computers and Operations Research
39
9
페이지
2196 ~ 2205