6년 동안 운영한 인공습지의 처리효율 분석

Analysis of Efficiency of Artificial Wetland forWaste Water Treatment Past Six Year Operation
  • 허재규
  • 남종현
  • 김용전
  • 김인선
  • 최경숙
  • 외 2명

초록

For waste water treatment, artificial wetland was constructed in 1998. The size of artificial wetland is 20m 200m, with sand and gravel as media and Phragmites japonica was implanted. The removal rate of BOD, TN, and TP were 86%, 33% and 25% from June 2004 to November 2005 respectively, while those were 88%, 38% and 55% in 1999. Organic materials and nitrogen compounds are still effectively removed, after 6 years of construction, but the removal efficiency of phosphorus compounds is reduced. So for sustaining of artificial wetland as waste water treatment system, the removal efficiency of phosphorus compounds must be elevated.

키워드

MonitoringNutrient removalSubsurface flow wetlandsTotal phosphorous.
제목
6년 동안 운영한 인공습지의 처리효율 분석
제목 (타언어)
Analysis of Efficiency of Artificial Wetland forWaste Water Treatment Past Six Year Operation
저자
허재규남종현김용전김인선최경숙최승익안태석
발행일
2007-06
유형
Y
저널명
한국환경복원기술학회지
10
3
페이지
1 ~ 7