상세 보기
초록
- In this paper, a coordinated scheduling algorithm is proposed to reduce end-to-end delay in distributed control systems. For the algorithm, the analysis of practical end-to-end delay in the worst case is performed priory with considering implementation of the systems. The end-to-end delay is composed of the delay caused by multi-task scheduling of operating systems, the delay caused by network communications, and the delay caused by asynchronous timing between operating systems and network communications. Through some simulation tests based on CAN(Controller Area Network), the proposed worst case end-to-end delay analysis is validated. Through the simulation tests, it is also shown that a real-time distributed control system designed to existing worst case delay cannot guarantee end-to-end time constraints. With the analysis, a coordinated scheduling algorithm is proposed here. The coordinated scheduling algorithm is focused on the reduction of the delay caused by asynchronous timing between operating systems and network communications. Online deadline assignment strategy is proposed for the scheduling. The performance enhancement of the distributed control systems by the scheduling algorithm is shown through simulation tests.
키워드
- 제목
- 하이브리드 PWM 방식을 이용한 브러시리스 직류 전동기의 속도 제어 성능 향상
- 제목 (타언어)
- Performance Improvement of BLDC Motor Speed Control Using Hybrid PWM Method
- 저자
- 이동훈; 오태석; 전성구; 김일환; 남부희
- 발행일
- 2004-07
- 유형
- Y
- 저널명
- 전기학회논문지 D권
- 권
- 53
- 호
- 7(D)
- 페이지
- 491 ~ 500