상세 보기
피치 루프 개별 게인 스케줄링 기법을 통한 타워 하중 저감 제어
- 김철진;
- 김관수;
- 송원;
- 백인수
초록
This paper deals with the NREL(National Renewable Energy Laboratory) 5 MW reference wind turbine for offshore system. The controller which include MPPT(Maximum Power Point Tracking) control to recover the maximum energy from wind and pitch control to limit the power output is applied to wind turbine. Conventional pitch loops have used the same sensitivity scheduling to the P gain signal and I gain signal(CPS, Collective Pitch gain Scheduling). However, this technique only focuses on power control without considering the load on the wind turbine. In addition, the stability of the system can not be guaranteed since the pitch control loop has a low phase margin. Therefore, this paper proposes a technique, which applies gain scheduling individually to the P gain signal and the I gain signal(IPS, Individual Pitch gain Scheduling) for load reduction. To verify the effect, electrical power and tower root moment DEL(Damage Equivalent Load) were set as performance indices. Simulations were performed for 600 seconds under the wind conditions of the normal turbulence model, the turbulence intensity of16 % and the wind speeds of 12~25 m/s. . The proposed IPS technique was found to reduce the fore-aft moment DEL of the tower up to 14.49 % than the existing collective pitch scheduling.
키워드
- 제목
- 피치 루프 개별 게인 스케줄링 기법을 통한 타워 하중 저감 제어
- 제목 (타언어)
- Tower Load Reduction Control by Pitch Loop Individual Gain Scheduling
- 저자
- 김철진; 김관수; 송원; 백인수
- 발행일
- 2018-09
- 유형
- Y
- 저널명
- 풍력에너지저널
- 권
- 9
- 호
- 3
- 페이지
- 25 ~ 32
- 언어
- KOR
- 출판사
- 한국풍력에너지학회
- 발행국가
- 대한민국
- 분량
- 8 페이지
- ISSN
- E 2733-9467
P 2093-5099