Abnormal data refinement and error percentage correction methods for effective short-term hourly water demand forecasting

  • Seok, Joon-hong
  • Kim, Jeong-jung
  • Lee, Joonyong
  • Lee, Jujang
  • Song, Young-joo
  • 외 1명
Citations

SCOPUS

9

초록

A short-term hourly water demand forecasting algorithm is needed in order to ensure a stable and safe supply of water. Unlike daily or monthly water demand forecasting, there are a large amount of fluctuation of hourly water demand. Hourly water demand is affected by short time period and abnormal data caused by the sensor, communication, and water treatment plant problems. An effective refinement method that detects and corrects the abnormal data among the historical data is needed to achieve accurate and practical hourly water demand forecasting. In this paper, we suggest an abnormal data refinement out of a confidence interval (ADR-CI) method and an error percentage correction (EPC) method. These methods try to distribute and revise the incoming hourly water demand and past water demand data. The proposed methods are verified by the experiments in a real water supply plant during a year. © 2014, Institute of Control, Robotics and Systems and The Korean Institute of Electrical Engineers and Springer-Verlag Berlin Heidelberg.

키워드

Abnormal data refinementerror percentage correctionwater demand forecastingwater supply
제목
Abnormal data refinement and error percentage correction methods for effective short-term hourly water demand forecasting
저자
Seok, Joon-hongKim, Jeong-jungLee, JoonyongLee, JujangSong, Young-jooShin, Gangwook
DOI
10.1007/s12555-014-0001-z
발행일
2014
유형
Article
저널명
International Journal of Control, Automation, and Systems
12
6
페이지
1245 ~ 1256