Deformation characteristics during construction and after impoundment of the CFRD-type Daegok Dam, Korea

Citations

WEB OF SCIENCE

45
Citations

SCOPUS

48

초록

The deformation characteristics of a concrete-faced rock-fill dam (CFRD) during the dam's construction and initial reservoir filling phases were investigated. A detailed examination of behavior of a CFRD during the construction stage was conducted for the CFRD-type Daegok Dam located in Korea, where a well-designed monitoring program was planned. The monitoring record obtained during the dam construction and initial impoundment is presented. The vertical displacements during dam embankment are compared with other CFRD cases in Korea. Two-dimensional finite element analyses were performed to assess the displacements during both the construction and initial reservoir filling stages, using the model parameters estimated based on large-scale triaxial tests. A nonlinear and inelastic constitutive soil model was used to represent the behavior of the rock materials. In addition, the monitoring results for 29 CFRDs were analyzed. The observed and predicted values on the normalized maximum displacement and the location of maximum values during the dam construction stage agree well. Also, the limitations of numerical analysis on the reservoir filling stage are addressed. (C) 2014 Elsevier B.V. All rights reserved.

키워드

Concrete-faced rock-fill dam (CFRD)Monitoring resultsNumerical analysisLarge-scale triaxial testCase histories of CFRDROCKFILL DAM
제목
Deformation characteristics during construction and after impoundment of the CFRD-type Daegok Dam, Korea
저자
Kim, Yong-SeongSeo, Min-WooLee, Chung-WonKang, Gi-Chun
DOI
10.1016/j.enggeo.2014.06.009
발행일
2014-08-21
유형
Article
저널명
Engineering Geology
178
페이지
1 ~ 14