대기시간을 허용하지 않는 두 단계 조립시스템에서 총 작업완료시간 최소화를 위한 일정계획 연구

A Scheduling Problem to Minimize Total Completion Time in a No-Wait Two-Stage Assembly-Type Flow Shop

초록

This research investigates a no-wait two-stage assembly-type flowshop for the objective of minimizing total completion times. The first stage consists of m machines on which mtypes of components are fabricated, while the second stage has a single-machine on which thosecomponents are assembled. In the problem, the assembly operations in the second stage should be started immediately after those fabrications are completed in the first stage. This problem is modeled in a mathematical programming formulation and the optimal solutions are obtained by CPLEX. Since this problem is known to be NP-complete, heuristic algorithms are proposed to solve the large sized problem within a short computation time. Computational experiments on randomly generated problem instances are done to evaluate the performance of the algorithms and the results are reported.

키워드

SchedulingTwo-Stage Assembly-Type FlowshopNo-WaitTotal Completion Time
제목
대기시간을 허용하지 않는 두 단계 조립시스템에서 총 작업완료시간 최소화를 위한 일정계획 연구
제목 (타언어)
A Scheduling Problem to Minimize Total Completion Time in a No-Wait Two-Stage Assembly-Type Flow Shop
저자
한준희정봉주이주용심상오
DOI
10.7737/KMSR.2019.36.4.001
발행일
2019-12
유형
Y
저널명
경영과학
36
4
페이지
1 ~ 12