상세 보기
Algorithms for a 2-stage hybrid flow shop scheduling problem with two classes of jobs
- Lee, Ju-Yong;
- Jeong, BongJoo
WEB OF SCIENCE
0초록
This study addresses the complex 2-stage hybrid flow shop (HFS) scheduling problem, which involves urgent and normal jobs in a multi-agent context. The goal is to simultaneously minimize the makespan for normal jobs and the total tardiness for urgent jobs. Our proposed approaches include a Mixed-Integer Programming (MIP) model, list scheduling algorithms (MEDD, MEDD2), constructive algorithms (MNEH, MN-NEH, MFL, MN-MFL), and a simulated annealing (SA) metaheuristic to find practical solutions. Extensive experiments, using randomly generated instances which reflect real manufacturing environments, validate the algorithms' performance. The SA algorithm consistently exhibits a superior and robust performance across all scenarios, finding solutions remarkably close to the optimal. Additionally, MFL and MN-MFL show noteworthy efficiencies and stable performances, indicating their potential for practical applications in rapid decision-making environments.
키워드
- 제목
- Algorithms for a 2-stage hybrid flow shop scheduling problem with two classes of jobs
- 저자
- Lee, Ju-Yong; Jeong, BongJoo
- 발행일
- 2026-04
- 유형
- Article
- 권
- 22
- 호
- 4
- 페이지
- 1609 ~ 1628